IBAKH (Int' Engineering and Procurement Bureau)

Engineering Supervision of the Erection and Commissioning Works for Ingula Pumped Storage Scheme as South Africa’s largest hydro power project to date, 2016

Browsing Archive: January, 2012

Rehabilitation of Hinterrhein Hydro-Power Plants in the Swiss Alps, 2011-2012

Posted by Public Relations on Sunday, January 8, 2012,


Heart of the plant: The Valle di Lei reservoir

IBAKH is participating in Engineering Supervision of Overall Rehabilitation of Hinterrhein Hydro-Power Plants (Gesamterneuerung der Wasserkraftanlagen) in Thusis Region of Canton Graubünden in the Swiss Alps since October 1, 2011. The Kraftwerke HinterRhein AG (KHR), built between 1956 and 1963 at a cost of some CHF 620 million, is a three-level Hydro-Power Plant group. With the Hydro-Power Plants at Ferrera, Bärenburg and Sils, KHR operates t...


Continue reading ...
 

Joint cooperation of IBAKH and SeWa in Energy Sector, West Africa, 2011

Posted by Public Relations on Saturday, January 7, 2012,

Director IBAKH, Business Development Manager and Technical Manager SeWa, in Power Plant of Industrial Factory, Nigeria, West Africa, November 15, 2011.

Following the strategy to penetrate the West Africa market in the Energy sector, IBAKH (International Engineering-Bureau, Switzerland) and SeWa (Steag Encotec West Africa, Nigeria) have signed a cooperation agreement aimed at furthering joint cooperation in Power Plant Industry and Technology(2011).   The memorandum, which was signed by...


Continue reading ...
 
 
 

About Me